By early 1942, it was apparent that the Sherman tank was no match for its German adversaries. American battle doctrine of the time was that US tanks were not to fight opposing tanks, leaving this to tank destroyer units; however, the German forces refused to adhere to this plan. A number of different models using various chassis, turret, and gun combinations were tested, leading up to the T26 ‘heavy’ tank design. It would be 1945 before this tank evolved into the T26E3 and finally saw combat. The basic design of the M26 – the designation the T26E3 had been given when it was classified ‘standard’ in March 1945 – was to form the basis of a long line of excellent tanks (M46, M47, M48 and M60) that would serve US armed forces for 40 years. Illustrated with 250 photographs, colour profiles, and detailed line drawings; Doyle. 80 pages.
Categorized in Armour Walk Around, Walk Around
Other Products You May Also Like:
MAI Issue 158 - Sept 2018
by adminJasmyn Plan MF33
by adminPZL P24 Plan MF40
by adminRoyal Aircraft Factory FE8 458mm cut parts for Plan471
by admin
Shopping Cart
There are no items in your cart.Latest Products Added
MMI Issue 244
by adminSlot - Issue 73
by adminMAI Issue 252
by adminIssue 152 (1070)
by adminTMMI Issue 369
by adminMMI Issue 243
by adminMAI Issue 251
by adminTMMI Issue 368
by adminIssue 151 (1069)
by adminMMI Issue 242
by adminMAI Issue 250
by adminTMMI Issue 367
by adminIssue 150 (1068)
by adminMMI Issue 241
by adminMAI Issue 249
by adminIssue 149 (1067)
by adminTMMI Issue 366
by adminSlot - Issue 72
by admin
























